KBN – Flood Control Project

Project :
KBN FLOOD CONTROL

End User :
Kawasan Berikat Nusantara

Year :
2016

About the project

Industrial Estate in North Jakarta

In a year 2016 PT. Andalan Inti Rekatama won the project to controling the flood in around Kawasan Berikat Nusantara Area and we have been choosing to supplied the Flood Pump.

Leave a Reply

Your email address will not be published. Required fields are marked *